In office buildings, lighting and HVAC account for the bulk of energy use. ACEMATIC uses a DALI or KNX lighting bus to carry circuits and dimming, combined with occupancy, daylight and metering modules, turning on-demand lighting and sub-metering into an operating routine rather than a one-off project.
Lighting Bus and Circuit Design
Office lighting is best organised on three levels: zone, circuit and scene. Open workstations, meeting areas, corridors, washrooms and the underground car park should be grouped separately, so that time-based and zone-based strategies can act on each. DALI suits high-volume dimmable luminaires, while KNX suits mixed scenarios that need deep linkage with shading, metering and HVAC.
- Workstation areas: a base illuminance plus fine tuning from workstation sensing, avoiding all-on or all-off behaviour.
- Meeting areas: scene-based (presentation / discussion / projection), linked to the control panel or a booking system.
- Public areas and car park: occupancy sensing plus a schedule strategy, dimmed down at night.
Energy Metering and Saving Benchmarks
Sub-metering is the precondition for saving. Meter lighting, sockets and HVAC separately, at least down to floor / zone granularity. The ranges below are typically achievable:
| Strategy |
Area |
Typical saving |
Effort |
| Occupancy-sensed dimming |
Office / meeting |
~20%–35% |
Low |
| Constant-illuminance control |
Window-side workstations |
~10%–25% |
Medium |
| Time- and zone-based strategy |
Public / car park |
~15%–30% |
Low |
| Dashboard-driven tune-up |
Whole building |
~5%–15% |
Medium (needs operation) |
Implementation tip: first complete the two foundational capabilities — sub-metering and occupancy sensing — and use the data to find the abnormal floors or time windows. Then add constant-illuminance and scene strategies where they pay. The ROI is clearer and troubleshooting is simpler.
Deployment and O&M Essentials
- Sensor layout: occupancy coverage should avoid HVAC draughts and partition shadowing, while daylight sensors face the glazing and stay clear of furniture or planting.
- Edge and cloud: the local gateway / edge AI host handles real-time control while the cloud does trend analysis and reporting; if the network drops, basic lighting logic falls back to the local node.
- Handover and iteration: export the circuit mapping and the metering baseline at handover, then tune thresholds against operating data instead of fixing them once and forgetting them.
Facilities Workflow and Reporting
The system only pays back if the facilities team can act on it without a specialist on speed dial.
- Commissioning: verify every zone’s occupancy and daylight behaviour on real hardware, and agree the comfort and savings baselines with the client before sign-off.
- Weekly review: a short dashboard pass flags floors running hot or dark, and turns a vague complaint into a targeted work order.
- ESG reporting: monthly sub-metered exports feed scope-2 energy and carbon reports without manual meter reads.
- Continuous tuning: adjust schedules each season rather than annually, so the building tracks how the tenant actually uses it.
The value of smart office lighting is not that the lights can be remote-controlled, but that they stay exactly right all year with no manual intervention — and every kilowatt-hour can be explained.